First installation and industry pack — Engineering Maintenance
Who this is for: the new customer administrator, the industry setup owner, and the project, safety and quality leads.
1. The three setup stages
| Stage | What happens | Your completion check |
|---|---|---|
| 1 · Software installation | Creates the jobs database, installs the standard apps and the delivered JobLink modules, then starts JobLink. | Installation finishes and the login page opens. |
| 2 · Industry pack | Recognises existing starter records, adds missing items, fills selected defaults, turns on checklist auto-pick and prepares PDF presentation defaults. | Add completes, the Pack Log is available and the remaining to-dos are assigned. |
| 3 · Your configuration | You enter real people, rates, calendars, scopes, evidence and connections, and review the business content. | A representative job and user workflow are checked before real use. |
Before you begin: use the complete customer folder for your release on the agreed Mac or Linux Docker host; have Docker running; nominate the administrator, legal company and branches; know which industry, countries and Australian states you actually offer; have your licence ready.
2. Install the new customer system
- Open Terminal in the customer folder and run
bash setup.sh. Keep the window open until it finishes. - Open JobLink (locally
http://localhost:8069, or the address your installer gave you). - Change the first administrator password straight away.
- Go to Settings → SourcNZ Licence, give the Database ID to your supplier, enter the issued key and choose Activate Key.
- Have your installer confirm backups, recovery ownership, HTTPS for remote and mobile use, and access settings.
Keep install.log and the time of the error, and contact implementation support. Don't send password files or licence secrets.
3. Industry Packs setup
Sign in as a Settings administrator, pick the right company in the company switcher, then open Settings → JobLink → Industry Packs. Fill in the company, legal country, NZBN / ABN and GST number, licence numbers for documents, the industry (Engineering Maintenance), Works In (NZ, AU or both) and, for Australia, the actual states and territories.
Choose Next: Preview, read each row (Will be added, Already there, Module locked by licence, Module not installed, To do (you)), then choose Add. Check View Pack Log and give each to-do to a real owner. Then invite your first users with their roles, or skip and add them later.
4. What the Engineering Maintenance pack adds or recognises
- Disciplines / job types: Mechanical; Fabrication / Welding; Hydraulics; Heavy Diesel; Machine Shop; Piping / Pressure; Instrumentation; Protective Coatings; Rigging / Scaffolding; Shutdown.
- Skills / trades: Fitter Welder; Mechanical Fitter; Boilermaker; Machinist; Hydraulic Technician; Rigger; Scaffolder; Diesel Mechanic; Instrumentation / E&I Technician; Pipefitter; Coatings Applicator / Blaster; Electrician; Apprentice; Civil Plant Operator.
- Basic job checklist: Maintenance Job
- Document-library folders: Maintenance Records (MDR / ITP).
- H&S inspection templates: Shutdown Pre-start: Isolations & Permits; Take 2.
- Starter quote products: LAB-FIT Mechanical fitter, LAB-WELD Welder / boilermaker, LAB-RIG Rigger, LAB-ELEC Electrician, LAB-APP Apprentice (per hour); HIRE-CRANE, HIRE-EWP, HIRE-SCAF; CALLOUT. New products and rates start at 0; enter your own approved rates before quoting.
5. Your job checklist and eForms
Selecting Engineering Maintenance turns on Pick automatically for the Engineering Maintenance NZ and / or AU checklist.
| Starter checklist item | When | Starter requirement |
|---|---|---|
| Site induction done | Before start | Required; blocks clock-in |
| Take 2 before the task | Before start | Required |
| Isolation / LOTO in place | Before start | Required; blocks clock-in |
| Hot work permit (if required) | Before start | Optional starter; assess applicability |
| Confined space permit (if required) | Before start | Optional starter; assess applicability |
| Working at heights permit (if required) | Before start | Optional starter; assess applicability |
| Plant pre-start (if required) | During | Optional starter |
| Engine / Hydraulic Maintenance Check | Before completion | Required |
| Test and tag record (if required) | Before completion | Optional starter |
| Work completed to scope - Practical Completion | Before completion | Required |
| Customer sign-off | Handover | Required |
The AU checklist also includes SWMS for high-risk construction work before start as an optional starter line.
Before crews use it: review the Compliance rules (Jobs → Configuration), the forms and checklists (JobLink eForms), then Refresh wording from rules and Approve content. Test one ordinary case and one blocked case on a training job.
6. Quality trade packs
The library includes these draft reference families for Engineering Maintenance (each for NZ and for VIC, NSW, QLD, WA, SA and ACT). They are drafts to review, not approved methods.
- Mechanical maintenance and machinery overhaul
- Pumps and pumping systems
- Hydraulic machinery systems
- Pneumatic systems and compressed air
- Rotating equipment and condition monitoring
- Conveyors and material handling
- Machine guarding and energy isolation
- Lifting equipment and rigging
- Cranes hoists and winches
- Pressure vessels and receivers
- Boilers and steam systems
- Process piping and pipework
- Mobile plant and heavy equipment maintenance
- Shutdown turnaround and restoration
- HVAC ventilation and air handling
- Refrigeration and heat pumps
To use QC on a job: record real Reviewer appointments, review and activate the pack, set the job's Quality scope, apply the pack and approve the plan. See the Quality Control guide.
7. PDF layouts, users and defaults
- PDF layouts: Settings prepares factory layouts for your legal company. Check them in PDF Layouts → Report Catalogue. Industry reports include: Shutdown Report; Rebuild Report; Dyno Test Certificate; Call-out Service Report; Service Report; Van Restock Summary.
- Users and roles: give each person one primary User Role. Industry roles include Maintenance Planner, Shutdown Coordinator and Workshop Manager, plus the industry Project Manager, Supervisor, Tradesperson / Field and Contractor roles.
- Defaults to review after Add: confirmed-quote job creation, checklist lead time (7 working days), retention / defects, vendor insurance warning (30 days), quote approval threshold, and payroll / rates.
- Industry pay codes: SHUTD Shutdown allowance; NIGHT Night shift loading; CONFSP Confined space allowance; LEAD Leading hand allowance; FARE Fares and travel allowance.
8. Your first representative job
A pump maintenance job. Record the real plant or customer asset, work order, isolation boundaries, required permits, tools and approved drawings. Use shutdown and workshop workflows only where they are part of what you bought.
- Enter the correct company / branch, customer, actual work site, country / state, timezone and discipline.
- Build the WBS and activities for the real scope and assign the crew.
- Check the checklist, approved forms, permits, inductions and QC load as expected.
- Record a small test timesheet, approve it, and compare job costs and the PDF output.
9. Before real use: your acceptance checklist
Installation and licence · company and pack scope · Pack Log and to-dos · users and workforce · rates and commercial settings · forms and QC · first job and time · one blocked case · PDF outputs · connections and recovery. Record an owner and date for each (the PDF has a printable record).
JobLink records your processes and supports your obligations. It does not certify compliance with any standard, code or law. Not legal advice.